Services Provided
Quick Facts
- Located in Omaha, NE
- New 4-story dental college
- 200,000 sf higher education facility
- Lower level parking garage
- Lower level mechanical area
This facility is a four-story structure with a total of 200,000 square feet of finished floor space. The structure includes below grade parking and is supported on a deep foundation system. Prior to construction of the facility,
Thiele Geotech, Inc. provided environmental services including Phase I and Phase II Environmental Site Assessments, Petroleum Release Tier 1 Risk-Based Corrective Action, and supplemental environmental screening investigations. Additionally, Thiele Geotech, Inc. conducted multiple geotechnical explorations.
Recommendations developed during the preliminary investigations included utilizing an under-slab drainage system to reduce the risk for water infiltration and provide a means for contamination mitigation. Final geotechnical recommendations were provided for deep and shallow foundations, retaining wall construction, overexcavation of existing uncontrolled fill, soil compaction, and pavements.



St. Wenceslaus Church



